Drainage:

Sufficient drainage to ensure we would never have to replace the foundation again.

       

Berkeley Construction coated the concrete with asphalt waterproof coating, then insulated with two inches of rigid foam insulation.  To break up the capillary action of the soil, they placed mira-drain around the perimeter and placed drainage pipe at the base of the foundation footings.  Finally, the foundation trenches were back filled with gravel.

 

Drainage east side.JPG (53894 bytes)                        Drainage Detail.JPG (29807 bytes)                        Materials.JPG (44155 bytes)       

 

A plumber installed the sewer pipe lines for the bathrooms and showers.  

 This pipe will lie underneath the concrete slab.

                                   